Oppose Setting up of 6.5 GW AI Data Centers in Visakhapatnam

A large-scale hyperscale AI infrastructure buildout is planned across coastal Andhra Pradesh, raising critical questions about land use, water demand, energy consumption, and ecological impact.

AI Data Centers are sprawling across the city

Overview of announced project sites in Visakhapatnam

Google-Adani Tarluvada 1 GW Data Center
1 GW capacity across 266.6 acres in Tarluvada, Anandapuram mandal, Visakhapatnam.
Google-Adani Rambilli 1 GW Data Center
1 GW capacity across 174.8 acres in Rambilli, Anakapalle district.
Google-Adani Adavivaram 512 MW Data Center
512 MW capacity across 165.40 acres in Adavivaram, Mudasarlova reservoir catchment.
Reliance Bhogapuram 1.5 GW Data Center
1.5 GW capacity on 854.97 acres in Bhogapuram, Vizianagaram district.
ReNew Makavarapalem 1 GW Data Center
1 GW compute park on 433.30 acres in Makavarapalem, Anakapalle.
Sify-Meta Paradesipalem 550 MW Data Center
550 MW hyperscale facility on 50 acres in Paradesipalem, Visakhapatnam.

Projects Information

The Massive Scale of these Hyperscale Data Centers are a huge concern

Developer Location Status Capacity Land
Google - Adani Tarluvada Under Construction 1 GW 266.6 acres
Google - Adani Rambilli Under Construction 1 GW 174.8 acres
Google - Adani Adavivaram-Mudasarlova Under Construction 512 MW 165.40 acres
Reliance Bhogapuram Proposed 1.5 GW 854.97 acres
CtrlS Rambilli Land Alloted 100 MW 49.93 acres
Sify - Meta Paradesipalem Land Alloted 550 MW 50 acres
Adani Madhurawada Land Alloted 200 MW 130 acres
Adani Kapuluppada Cancelled 100 MW 60.29 acres
Sify - Meta Madhurawada Land Alloted 50 MW 3.6 acres
Shreetech Data Limited (CLS) Madhurawada Land Alloted - 1.3 acres
ReNew Makavarapalem Land Alloted 1 GW 433.30 acres
RMZ & Colt Jagannadhapuram Land Alloted 486 MW 200 acres
AM Intelligence Labs Bheemili Land Alloted 512 MW 6.82
TCS - OpenAI Rambilli Land Alloted 1 GW 200 acres
Total 8.0 GW 2,597.01 acres

* Capacity, land allocation and project status are based on publicly available announcements and company disclosures. See Resources section for more information about each project.

8.7 GW

Electricity Demand

β‰ˆ 1Γ— Andhra Pradesh's Power Consumption

If fully built, the proposed AI data centers capacity could consume as much as the entire electricity currently used by the state of Andhra Pradesh

200 MLD

Water Requirement

β‰ˆ 50% of Vizag's Daily Water Supply

Vizag is already severely water stressed and cooling these data centers could take up almost half of CIty's supply based on estimates

2,150

Acres of Land

β‰ˆ 580+ Cricket Grounds

The proposed land allocation is roughly equivalent to more than 580 cricket grounds, and is present in eco-sensitive regions

Sources: 8.7 GW proposed capacity from Andhra Pradesh government announcements and project MoUs. Water demand (200 MLD) calculated using industry estimates for hyperscale AI data centres, at 1L per 1KWh. Land requirement (2,150 acres) from announced project allocations. Comparisons use Andhra Pradesh electricity demand, GVMC water supply figures, and a standard cricket ground area of 3.7 acres.

Our Concerns

AI data center projects of this scale raise important questions that deserve transparent public discussion and independent scientific assessment.

πŸ’§

Water Security

Large AI facilities require substantial fresh water for cooling. We seek clarity on long-term water sources and potential impacts on households, agriculture and industry.

Learn More
⚑

Energy Demand

A 6.5 GW power requirement could require major investments in generation and transmission infrastructure, with broader implications for the regional grid.

Learn More
🌿

Environment

Data center sites are in close proximity to forests, wildlife santuaries, coastal ecosystems, and residential areas. There are concerns of heating affect and noise pollution.

Learn More
🌍

Climate Impact

Hyperscale AI facilities can significantly increase regional greenhouse gas emissions through backup Diesel Generator sets, solid waste, etc.

Learn More
🌾

Land Use

Thousands of acres have been proposed for industrial development both for data centers and energy infrastructure that power these data centers.

Learn More
πŸ“„

Transparency

Water assessments and power planning documents should be publicly available for independent review.

Learn More

Latest Resources

Government documents, news reports, research papers, and media coverage.

Sign the Petition

Thousands of residents, researchers and supporters are calling for transparent environmental assessments and public consultation before these projects move forward.

16,652 signed Goal: 20,000
83% of goal reached
Sign on Change.org β†’

You will be redirected to Change.org to sign the petition.

Join the Campaign

We are building a campaign to demand accountability and oppose destructive development. Reach out to us if you would like to take part.

  • βœ“ Volunteer with the campaign
  • βœ“ Share research or documents
  • βœ“ Request a media interview
  • βœ“ Partner as an organisation
βœ” Submitted successfully
Follow on Instagram
Email: [email protected]